Burrup Seawater Jetty 2019 Maintenance (Current project)

Location: Burrup

Client: Water Corporation

Contract value: $ 1.5 million

Scope (main elements only): 

• Work planning including work methods, site safety and environmental management plans;
• Site measure and prepare shop drawings for secondary member replacement;
• Removal of grid mesh
• Supply and install secondary members

• Setup scaffolding including containment barriers
• Blasting of the following primary members
• Blasting of the following secondary members
• Blasting of piles
• Coating of the following primary members
• Coating of the following secondary members
• Coating of piles
• Reinstatement of grid mesh
• Supply of as-constructed drawings.


VDE’s responsibility:

  • Work planning including work methods, lifting plans and methodologies of work
  • Survey and shop detailing
  • Supply, fabricate and install structural steel works
  • Transporting
  • Erection of scaffolding
  • Sand blasting of members
  • Coating of the members as per WC specifications
  • Reinstatement of grid mesh
  • Supply of as-constructed drawings

Posted on Jul 19, 2019


ISO