Location: Burrup
Client: Water Corporation
Contract value: $ 1.5 million
Scope (main elements only):
• Work planning including work methods, site safety and environmental management plans; • Site measure and prepare shop drawings for secondary member replacement; • Removal of grid mesh • Supply and install secondary members
• Setup scaffolding including containment barriers • Blasting of the following primary members • Blasting of the following secondary members • Blasting of piles • Coating of the following primary members • Coating of the following secondary members • Coating of piles • Reinstatement of grid mesh • Supply of as-constructed drawings.
VDE’s responsibility:
Posted on Jul 19, 2019