Lower Helena pump station

Location: Lower Helena

Client: Water Corporation

Contract value: $1.1million

Scope: 

  •  Supply, fabricate, erect 120 tons structural steel, platforms, staircases for Lower Helena pump station.

VDE’s responsibility:

  • Shop detailing of whole pump station inclusive of all structural steel work, stairs, landings and tilt panels.
  • Workshop fabrication of all steel work.
  • Surface treatment.
  • Transport to site.
  • Installation of all steel work and tilt panels.





Posted on Feb 10, 2017


ISO